Elevation Looking Northwest Photo taken by James F. White, March 1988, for HAER |
![]() |
View From Approach Looking North Photo taken by James F. White, March 1988, for HAER |
![]() |
Second Pier From North Approach, View From East Side Photo taken by James F. White, March 1988, for HAER |
![]() |
Third Pier From North, View From West Photo taken by James F. White, March 1988, for HAER |
![]() |
Abutment Northwest Corner North Approach Photo taken by James F. White, March 1988, for HAER |
![]() |
South Abutment Substructure And Base Photo taken by James F. White, March 1988, for HAER |
![]() |
Float Bridge, Constructed In 1881 (From City Of Norton Shores) Photo taken by Historic American Engineering Record |
![]() |
Steel Bridge Preceeding The Existing Bridge - 1909-1934 (From City Of Norton Shores) Photo taken by Historic American Engineering Record |
"Ths bridge is scheduled for reconstruction because of the deteriorated condition of the abutments and the deck. The vertical alignment has also been redesigned to bring it into compliance with today's geometric standards, and to provide safe sight distances. The bridge will be widened to accomodate increased vehicular traffic.
"Ayres, Lewis, Norris and May, Inc. or Ann Arbor, Michigan has prepared Contract Documents for the reconstruction. ALNM is also repsonsible for the HAER documentation of the structure."
Historic American Engineering Report
`