Tunnel underneath Harvey Canal on Old Business US 90 in New Orleans
Location
New Orleans, Jefferson Parish, Louisiana
Status
Open to four lanes of traffic with pedestrian access
History
Built 1957
Design
Tunnel
Dimensions
Total length: 1,079.7 ft.
Deck width: 43.9 ft.
Vertical clearance above deck: 13.4 ft.
Approximate latitude, longitude
+29.89667, -90.07833   (decimal degrees)
29°53'48" N, 90°04'42" W   (degrees°minutes'seconds")
Inventory number
BH 19033 (Bridgehunter.com ID)
Inspection (as of 09/2006)
Deck condition rating: Fair (5 out of 9)
Substructure condition rating: Satisfactory (6 out of 9)
Appraisal: Functionally obsolete
Sufficiency rating: 66.5 (out of 100)
Average daily traffic (as of 2005)
60,800

Comments 

Harvey Tunnel
Posted June 15, 2008, by Zee Loftus (zeedillon [at] yahoo [dot] com)

Two questions actually: 1.) How did someone build a tunnel in an area that is below sealevel?? 2.) Did the tunnel have any damage due to Katrina?? Thank you for your time to answer these questions.

Harvey Tunnel
Posted April 1, 2008, by Donna (donnabreaux2007 [at] yahoo [dot] com)

How much of the tunnel is underwater and how much is underland.